JDL Consultants

Civil and Structural Consulting Engineers

  • Home
  • About Us / Services
  • LiDAR Surveys
  • Our Work
    • Commercial
    • Domestic
    • Education
    • Historic/Listed
    • Leisure
    • Residential
    • Retail
    • Specialist
    • Temporary Works
  • Contact
  • Vacancies
Our Work

Commercial
Domestic
Education
Historic/Listed
Leisure
Residential
Retail
Specialist
Temporary works

BBC Cardiff
Architect –
Client ISG plc
Contract value £120m
Read more→

portfolio-projectsims-thumb
Project Sims Recycling
Architect HLN
Client Dudleys/Sims Group
Contract value £7.5m
Read more→

Langdons Lorry Park
Bridgwater
Architect –
Client Langdons
Contract value £1.0m
Read more→

new-build-pool-house
New Build Pool House
Architect Artisan Landscapes
Client –
Contract value –
Read more→

loft-extension
Loft Extension and Structural Alterations
Architect NH Plans
Client –
Contract value –
Read more→

portfolio-hansprice-thumb
Hans Price Academy
Weston-super-Mare
Architect BDP
Client Willmott Dixon
Contract value £13m
Read more→

Student’s Union, UWE
Bristol
Architect BAM
Client Stride Treglown
Contract value £6.6m
Read more→

portfolio-tauntonacademy-thumb
Taunton Academy
Architect Stride Treglown
Client Somerset LEP
Contract value £7.5m
Read more→

portfolio-constructionskills-thumb
Construction Skills Centre
Wiltshire College
Architect EWA
Client Wiltshire College
Contract value £2.5m
Read more→

portfolio-linktrowbridge-thumb
Link Building
Wiltshire College
Architect AWW Architects
Client Wiltshire College
Contract value £1.5m
Read more→

portfolio-chewvalley-thumb
Chew Valley School
6th Form Centre
Architect Bush Consultancy
Client BANES
Contract value £1.2m
Read more→

portfolio-surestart-thumb
Sure Start
Old Mixon
Architect GJS Architects
Client North Somerset District Council
Contract value £1m
Read more→

portfolio-stepney-green-thumb
Stepney Green
Sixth Form Centre
Architect AWW Architects
Client Tower Hamlets
Contract value £4.2m
Read more→

portfolio-abond-thumb
‘A’ Bond
Bristol
Architect –
Client Bristol City Council
Contract value –
Read more→

portfolio-kensingtonplace-thumb
Kensington Place
Architect Aukett Fitzroy Robinson
Client Battle Properties
Contract value £1.2m
Read more→

portfolio-bartonvale-thumb
Barton Vale
Bristol
Architect Vibe Architects Ltd
Client Wentworth Developments
Contract value £1.5m
Read more→

portfolio-waitrose-thumb
Waitrose
Wells
Architect Sutton Griffin
Client Discovery Properties
Contract value £3.5m
Read more→

portfolio-tescobedworth-thumb
Tesco
Bedworth
Architect Inspire Design
Client Bowmer and Kirkland
Contract value £13.5m
Read more→

portfolio-m-and-s-thumb
Marks and Spencer
Exmouth
Architect Inspire Design
Client Kilo Properties
Contract value £2m
Read more→

portfolio-waitrose-wichelstowe-thumb
Waitrose
Wichelstowe
Architect Inspire Design
Client Kilo Properties
Contract value £3.9m
Read more→

portfolio-wren-thumb
Wren Kitchens
Croydon
Architect Polkey Collins
Client Wren Kitchens
Contract value £1m
Read more→

portfolio-oldrectory-thumb
The Old Rectory
Swimming Pool
Architect Greenway Lee Architects
Client Private Client
Contract value £1.25m
Read more→

portfolio-cardiffbay-thumb
Cardiff Bay Tower
Architect Widley Fox
Client –
Contract value £17m
Read more→

portfolio-mercedes-thumb
Mercedes F1
Motorhome Base
Architect –
Client Mercedes AMG
Contract value £0.5m
Read more→

portfolio-williams-thumb
Williams F1
Motorhome Base
Architect –
Client Williams F1
Contract value £2m
Read more→

portfolio-toyotastand-thumb
Toyota Stand
Goodwood
Architect –
Client Layher Limited
Contract value –
Read more→

portfolio-premier-inn-thumbnail
Premier Inn
Tottenham Hale
Architect KKA
Client RGB
Contract value £5.5m
Read more→

portfolio-hilton-park-thumb
Casino Extension
Park Lane Hilton
Architect –
Client Hilton Group
Contract value £0.9m
Read more→

portfolio-verticalrugby-thumb
Vertical Rugby
Architect –
Client Layher Limited
Contract value –
Read more→

portfolio-forth-road-bridge-thumb
Forth Road Bridge
Scaffolding
Architect –
Client Brand Energy
Contract value £15m
Read more→

BBC Cardiff

Client ISG plc
We designed the tower crane bases for the new £120m
headquarters for BBC Wales. The project is scheduled for
completion in late 2018/early 2019 and located beside
Cardiff Central Station. The crane heights reach over 50m
which, combined with jib lengths of up to 60m, required
substantial piled base designs.

portfolio-bbc-cardiff

Project Sims Recycling

Architect HLN
Client Dudleys / Sims Group
Contract Value £7.5m
As a company we fully support projects which help reduce
embodied energy and our carbon footprint.
We are fortunate to be acting as Structural and Civil
Engineers to Dudleys for Sims Group in Newport. The new
recycling building and associated offices will improve the
efficiency and comfort for our client and allow recycling of
various materials to continue into this century.
By working closely with our client Dudleys to value engineer
the design we were able to bring the project within budget
at the tender stage and allow construction to begin.

projectsims

Langdons Lorry Park, Bridgwater

Client Langdons
Contract Value £1.0m
JDL Consultants undertook the detailed design of a new lorry
park at Langdons in Bridgwater. The design comprised long
strip concrete surfacing with surface water altercation.
Local Drainage Board approval was also obtained as two
crossovers were designed to cross a drainage ditch.

portfolio-langdons

New Build Pool House

Architect Artisan Landscapes (www.artisanlandscapes.co.uk)
JDL were instructed to undertake the structural design
relating a proposed new build pool house.
The proposed new build structure was to be constructed with
stone walls built off of strip foundations, with a timber
clad roof. Steelwork was designed to support the
cantilevering roof structure.

portfolio-pool-house

Loft Extension and Structural Alterations

Architect NH Plans (www.nhplans.co.uk)
JDL carried out the structural design relating to a dormer
loft conversion, as well as internal alterations within the
existing terraced property.
The proposed loft extension was to be constructed with
timber built off of steels spanning the width of the
property. A steel ridge was designed to support the roof
structure to allow for the proposed dormer loft space.

portfolio-pool-house

Hans Price Academy

Architect BDP
Client Willmot Dixon Construction
Contract Value £13m
Duration 2012 to 2013
Services Full Civil and Structural Design
This project was won through the Academies Framework, in
competition, and required JDL to design very cost effective
engineering solutions to maximise the budget available for
educational benefit. We were approached by Willmott Dixon to
join their team from the expression of interest stage and
stayed with them as we won through the various stages.
The programme on all Academy projects is very compressed
with very little time from award of contract to start on
site and this was no exception. The project involves both
in-situ concrete flat slabs and steel framed buildings with
piled foundations. We have also fully designed the extensive
external drainage and hard paved areas. We also successfully
completed detailed consultations with the EA over flooding
as the site is within a zone 3 flood area.

hansprice

Student’s Union, UWE, Bristol

Architect BAM
Client Stride Treglown
Contract Value £6.6m
We are employed as civil and structural engineers for the
development of a new Students Union building at the
University of West of England. The new building will have a
gross internal floor area of circa 3,000m2 and has just been
completed.

uwe

Taunton Academy

Architect Strides
Client BAM Construction
Contract Value £7.5m
Duration 2012 to 2014
Services Full Civil and Structural Design
We were approached by BAM Construction to make a proposal to
join their team in competition against other consultants.
BAM selected JDL and we went on to secure this project with
BAM.
The new academy is a mixture of new 2 and 3 story buildings
and structural adaptations of existing buildings, including
stripping one 1960’s building back to the bare structure.
This project has complicated phasing arrangements on a very
confined site. We have designed significant drainage
attenuation to allow the existing drainage outlets to be
used with flows limited.
Our designs have had to meet the strict bench mark budgets
for the current Academies building programme.

tauntonacademy

Construction Skills Centre, Wiltshire College

Architect EWA
Client Wiltshire College
Contract Value £2.5m
Duration 2013 to present
Services Full Civil and Structural Design
This project is currently out to tender and we will be
novated to the contractor under a D&B form of procurement.
The engineering challenges of this project are all based
around achieving the very least cost structural and civil
engineering design and de-risking the project to make it
attractive to the D&B contractor.

constructionskills

Link Building, Wiltshire College

Architect AWW
Client Wiltshire College
Contract Value £1.5m
Duration 2012 to 2013
Services Full Civil and Structural Design
This was a traditional contract to remodel some existing
buildings at the campus and create a new Link Building with
some “wow” factor to provide the College with a new entrance
and reception area. The finished Link Building is
contemporary and impressive and with the structural
alterations to the existing Ashton Building has given this
part of the campus a real lift in terms of ambiance. The
engineering challenges were very much centred on working in
and around existing services and structures.

linktrowbridge

Chew Valley School – Sixth Form Centre

Architect Bush Consultancy
Client Bath and North East Somerset Council (BANES)
Contract Value £1.2m
A new sixth form centre for the school, comprising a two
storey steel framed building with a large ground floor
common room and entrance lobby which can also be used as
reception space for school functions. The building required
long span structures to create the clear open space and we
were able to create an efficient structure by using pre-cast
slabs casting them compositely with the steel beams to the
upper floor level.
The new facilities include a 6th Form Café Common room,
study area, seminar room, photographic dark room and
Creative & Media suite.

chewvalley

Sure Start Old Mixon

Architect GJS Architects
Client North Somerset District Council
Contract Value £1.0m
This is a new building for North Somerset Council comprising
a feature glulaminate timber frame stabilised using a stress
skinned plywood roof back to timber infill panels which
again are plywood skinned and provide lateral restraint.

surestart

Stepney Green Sixth Form Center

Architect AWW
Client Tower Hamlets
Contract Value £4.2m
This three storey sixth form building sits directly on the
back of the pavement and has been designed to create some
“wow” factor for the school and as landmark. The building is
on a road junction with a curved pavement and hence the
front of the building is fully curved with continuous
curtain walling at ground floor level. The first and second
floor cantilever over the ground floor line on the curved
elevation.
To reduce cost the pad foundations sit on vibro improved
ground rather than piling. The frame is steel with a number
of radius members with concrete metal deck floor. The use of
true curves rather than facets created a number of detailing
challenges that have been overcome.

stepney-green

Bristol City Council

Client Bristol City Council
‘A’ Bond is one of 3 former bonded warehouses (the others
being ‘B’ Bond and ‘C’ Bond) which have become Bristol
landmarks. All three are now listed. An interesting
building, ‘A’ Bond has a frame of steel stanchions on the
lower 2 floors and iron on the rest, carrying RSJs to
segmental-arched concrete floor slabs. It is open plan, in 2
equal parts separated by central spine wall. 9 storeys high
it has 18 windows across each of the longer sides on each
floor and is and brick built. We were asked to undertake a
full internal and external structural survey of ‘A’ Bond
which was undertaken by two teams, and a detailed report was
produced with AutoCAD drawings of each floor.

abond

Premier Inn Tottenham Hale

Architect KKA
Client RGB
Contract Value £5.5m
We were employed as structural engineers for the development
of a new Premier Inn building at Tottenham Hale, London. The
96-room hotel caters for an estimated 30,000 guests per year
from its site in Station Road. The development marks the
first major strategic development in the Tottenham Hale
Master Plan.

premier-inn

Casino Extension – Park Lane Hilton

Client Hilton Group
Contract Value £0.9m
This was a particularly interesting project which involved
the construction of casino ‘pods’ on top of the Park Lane
Hilton. The pods were manufactured off site and craned into
position which involved the temporary closure of Park Lane
to enable the pod delivery lorries to be carefully
positioned to the crane lifting area.

hilton-park

Vertical Rugby

Client Layher Limited
As part of the preparation for the 6 nations rugby contest
in 2007 we assisted in designing a fascinating scaffold
design for the sponsors of the competition.
JDL prides itelf in not only working on lucrative high fee
projects but also enjoying the work which we undertake and
occasionally engineering the weird and wacky.

verticalrugby

Kensington Place

Architect Aukett Fitzroy Robinson
Client Battle Properties Limited
Contract Value £1.2m
A new build development of 10 stylish apartments in Clifton
Village, Bristol. We have worked with the design team to
develop high quality yet buildable details to maximise the
sales value of the apartments.

kensingtonplace

Barton Vale, Bristol

Architect Vibe Architects Ltd
Client Wentworth Developments
Contract Value £1.5m
Working closely with clients is one of our greatest
abilities. We understand the pressures of cost management
and the desire to change the design as the project develops.
By continually adding value to the project you as the client
will be able to achieve the building that meets your brief,
however that may change during the contract.
Although we live in a claim and blame culture regarding
engineering & design our pragmatic approach to the projects
we work on is second to none. We work through your problems
and not against them.

bartonvale

Waitrose, Wells, Somerset

Architect Sutton Griffin Architects, Newbury
Client Discovery Properties
Contract Value £3.5m
Duration 2012 to 2013
Services Full Civil and Structural Design
This project is a Waitrose Store of approximately 3,500 sqft
size which has been constructed on a site to the south west
edge of Wells city centre. The site was extremely compact
and the store has been set into the ground with perimeter
king post retaining walls to reduce the usual impact to the
surrounding areas.
As part of the development a new raised car park deck was
designed and built using a reinforced concrete frame to the
side of the store. The main building frame was designed as a
braced frame structure and was modelled using Revit 3D
software. The drainage was a complex arrangement which
required detailed negotiation with the Local Authority
drainage engineer.

waitrose

Tesco Bedworth, Coventry

Architect Inspire
Client Bowmer and Kirkland
Contract Value £13.5m
Duration 2010 to 2011
Services Full Civil and Structural Design
This project is very large new Tesco Store built “on legs”
over a new car park. We were appointed by the developer for
the site and then subsequently novated to the contractor
under a D&B contract. Both the design and build programme
were very compressed and we had to work very closely with
the contractor and his specialist package sub-contractors.
The store is 9960m² in footprint and is formed as a steel
frame with precast floors. To enable a coherent car park
strategy, the undercroft column grid is arranged as 16m x
7.5m with the store grid footprint arranged at 16m x 6m
using transfer beams at sales floor level. There are also
new retail units separate to the main building which are
positioned on the pedestrian route to the adjacent town
centre.
As much as possible of our design involved prefabricated
elements to speed the construction process.

tescobedworth

Marks and Spencer, Exmouth

Architect Inspire Design
Client Kilo Properties
Contract Value £2m
This project comprised 1,600sqm construction adjacent to the
Train Station in Exmouth. The building comprises piled
foundations and suspended piled reinforced concrete floor
slab with a steel frame superstructure supporting a
composite deck mezzanine floor.

m-and-s

Waitrose, Wichelstowe

Architect Inspire Design
Client Kilo Properties
Contract Value £3.9m
JDL Consultants undertook the full building structural
design and external works design for this interesting
butterfly roof for this 40,420 sq ft store. The store is
part set into the ground against a road on two sides and in
part was designed to support the highway.

waitrose-wichelstowe

Wren Kitchens, Croydon

Architect Polkey Collins
Client Wren Kitchens
Contract Value £1m
This project comprised undertaking a complete replacement of
the perimeter enclosure with a new steel structure
supporting a new curtain wall glazing system, including a
complete re-roof of the retail unit with new insulated
profiled deck floor.

wren

The Old Rectory Swimming Pool

Architect Greenway Lee Architects
Client Private Client
Contract Value £1.25m
Although still in the early stages at this time, we have
recently been commissioned to work with Greenway Lee in
London to develop the design of a cutting edge swimming pool
for a new client in the South East.
Unlike typical designs the unique roof is required to fold
back completely to be hidden beneath the pool base, a design
which has required us to rewrite the rule book regarding
swimming pool roof construction.
By modelling the RC elements in 3 dimensions we were able to
conceive the roof design and understand the further stages
required in the design.
We hope that this fantastic design opportunity will progress
beyond the initial stages so that we can demonstrate our
unique approach to engineering and working closely with top
architects to achieve perfection.

oldrectory

Cardiff Bay Tower

Architect Widley Fox
Contract Value £17m
As part of the initial planning stages of the project, JDL
undertook a feasibility study into the effects of the tower
on pedestrians at podium level.
By working with students at the University of Bath we were
able to computer model using Computational Fluid Dynamics
the effects of wind on pedestrians in the public areas.
The downdraughting of wind as it hits tall buildings is
widely documented and can have detrimental effects on public
spaces surrounding the buildings. The shape of this building
in particular with its sail form façade was particularly
concerning to the planners and undertaking CFX modelling
provided an insight into the possible wind speeds around the
entrance.
The conclusion in this case was that although the sail forms
would push wind downwards the main flow around the tower
remained laminar until the vortex shedding occurred directly
downstream of the sails. The effect to pedestrians would be
minimal as the predominant flow was around rather than down
the façade.
Unfortunately in this case the design was later
substantially changed to reduce cost and the reality was
never realised.

cardiffbay

Mercedes F1 Motorhome Base

Client Mercedes AMG
Contract Value £0.5m
This project involved the design of a demountable support
base for the motor homes used at the European F1 Racing
events.

mercedes

Williams F1 Motorhome Base

Client Williams F1
Contract Value £2m
We were involved in the design of the full superstructure,
demountable modular system together with the support base
for the motor homes used by Williams F1 at the European F1
Racing events. This had to be designed to enable erection by
forklifts to suit Bernie Ecclestone’s requirements.

williams

Toyota Stand, Goodwood

Client Layher Limited
We assisted by checking the structural design of this stand
which was used at the Goodwood Festival of Speed

toyotastand

Forth Road Bridge Scaffolding

Client Brand Energy
Working with a scaffold design company we have checked the
temporary scaffold systems for the maintenance works to the
Forth Road Bridge. This included scaffold systems suspended
from the bridge which is subjected to high winds running off
the Firth of Forth. It comprised design of systems required
for urgent maintenance in late 2015 in which steelwork
defects were discovered following a routine inspection
resulting in the closure of the bridge.

forth-road-bridge

T 01275 372 154E jdl@jdlconsultants.co.uk

ABOUT US  •  OUR WORK  •  VACANCIES  •  CONTACT

© 2008-21 JDL Consultants Limited  •  Website created by Paul Evans

BRISTOL OFFICE
27A Osprey Court, Hawkfield Way, Hawkfield Business Park, Bristol, BS14 0BB

LONDON OFFICE
1st Floor, 200 Tower Bridge Road, London, SE1 2UN - T 020 3727 5380

  • Home
  • About Us / Services
  • LiDAR Surveys
  • Our Work
    • Commercial
    • Domestic
    • Education
    • Historic/Listed
    • Leisure
    • Residential
    • Retail
    • Specialist
    • Temporary Works
    • Back
  • Contact
  • Vacancies